Cancer Treatment Center
Shreveport, LA
Client
Overton Brooks VAMC
Size
21,000 SF
Construction Cost
$8,600,000
Construction Date
N/A
Additional Information
This new Cancer Treatment Center was designed to complement the surrounding buildings on the Overton Brooks VA Medical Center campus with matching brick, cast stone, and aluminum window systems. The interior was designed with a balance of aesthetics, durability and timelessness in order to create a welcoming environment for veterans and their families.
The intent of this project was to create a full-service Cancer Treatment Center to serve the Shreveport area by including medical oncology, radiation oncology and hematology services under one roof. The Medical Oncology Department included (14) chemotherapy bays, an isolation room, pharmacy, blood draw, (8) exam rooms and triage. The Radiation Oncology Department included (2) linear accelerators, a computed tomography (CT) simulator, (3) exam rooms, an exam procedure room, dosimetry, and physics lab.
Spur Design issued 100% Construction Documents, but the project was canceled due to budget restraints.
Healthcare | Commercial | Federal | All
Renovate Medical Ward
Thomas E. Creek VA Medical Center
Amarillo, TX
Client
Amarillo VAHCS
Size
6,870/7,245 SF
Construction Cost
$3,200,000/$3,500,000
Completion Date
Professional Services 2016/2017
Construction 2019/TBD
Additional Information
Phase I of this renovation has completed construction and included the complete deck-to-deck demolition and rebuild to accommodate a 4-bed Medical/Surgical Inpatient Bed Unit on the existing 3rd floor of Building 28. The new patient-centered design incorporates private bed and bathrooms. Phase II includes the modification of the original contract that changed the patient rooms from the original ICU function to a Med-Surge function and is awaiting bid.